Solar Installation Scheduling for Small Installers

A solar crew in hard hats and high-visibility clothing working on panels along a roof ridge, with safety lines on the roof

24 Nov 2026Published by Launch Your Dream, built by Sharktech Global (opens in a new tab)

How a small solar business schedules an install: site notes, crew and accreditation, network approval, stock, reminders, reschedules and handover.

Key facts

  • The Clean Energy Council has handed installer and designer accreditation to Solar Accreditation Australia. New or renewing accreditation is with Solar Accreditation Australia (Clean Energy Council accreditation).
  • A new system that is to earn small-scale technology certificates must be designed and installed by a Solar Accreditation Australia accredited designer and installer, for that type of system (small-scale renewable energy systems).
  • The accredited installer holds an unrestricted electrical licence in the state or territory of the job, with narrow exceptions the regulator describes, including some off-grid systems. State rules still apply (solar installers and designers).
  • On that page, the installer attends for job setup, a mid-installation check, and testing and commissioning, with photos that show their face, the stage, and the date, time and location. A change of installer on a small-scale system up to 100 kW is notified before the installation.
  • Certificates are created in the REC Registry within 12 months of the installation. Documents are signed before creation. Validation usually takes 4 to 6 weeks, longer if the pack is incomplete (create small-scale technology certificates).
  • In Ausgrid’s network, the installer lodges the application and installs once it is approved. Many small systems are approved automatically. The customer should receive a Certificate of Compliance for Electrical Work (connecting solar). Other distributors publish their own steps.

What has to be finished before you promise an install day?

Do not put a roof day in the diary until the site notes are written, the equipment is on the way or in the shed, and the network application is in. A date given before those three are known is a date you will spend the week moving.

The site assessment covers address, roof access, the switchboard, any existing system, who will be home, and where materials can be dropped. Write it the day of the visit. Gear still on a truck is not an install. Modules and the inverter have to be on the Clean Energy Council approved list.

Network approval is the third gate. In Ausgrid’s area the installer lodges the application and installs once it is approved. From November 2026, Ausgrid says new requirements are being phased in for new and upgrading systems in NSW: a smart inverter that can respond to an emergency backstop, registration in the NSW Government CER Installer Portal, and a working internet connection. Confirm what this job needs. Other distributors, including Endeavour Energy and Essential Energy, publish their own steps.

How do you hand the job from the site visit to the crew?

The handoff is one note the office and the crew both open. It carries the site assessment, the stock, the application number, the accredited person’s name and the customer’s phone. A text to one leading hand is not that note.

Carrying panels does not replace the accredited person being there for the stages the regulator lists. If that person is on leave, the day is not offered. Write where the materials will be, and who calls if the delivery slips.

The enquiry, the quote and this note should be the same record, so nobody retypes the roof on a Sunday night. What belongs in that record is covered in what installers need from a solar CRM. The product page on this site is solar business software.

Who has to be on the roof, and for which part of the day?

The person named on an eligible system is an accredited installer for that type of job, on site for setup, a mid-job check, and testing and commissioning. The regulator wants photos of that person at those stages, with the date, time and location in the file.

Photos taken on a later visit, to fill a gap, are something it says it may fail.

Read the regulator’s page for the narrow cases where an unrestricted electrical licence might not be required. A labourer does not sign the compliance statement.

If the named person cannot finish, tell the regulator before the installation on a small-scale system up to 100 kW, with each person’s details and the reason. That notice is not required, on the same page, for a mid-scale system. Each person still has to be accredited for the type and licensed for the electrical stages they do.

A roof you would not stand on is not a day you keep. The safety gear the site needs, including a harness where the roof calls for one, is part of showing up ready. Solar installation scheduling fails in this gap more often than in the quote. A roof day with the wrong person, or with no approval, cannot.

What do you do when the weather or the network date moves?

Tell the customer the same day you know: what moved, why, and the next date you can keep. Offer a time you have already checked against the crew and the stock. If the network date slipped, say so. Silence is what turns a delay into a complaint.

A reschedule is a booking change, not a new sale. Keep the message to the time, the address and how to accept the new time. Do not add a discount. Which visits a trade business can book without a phone call is in online booking for tradies. The booking features are on online booking system. If the gear has not arrived, do not send the crew to wait. Name the next date that has both the stock and the people.

What should the confirmation and the install reminder say?

The confirmation goes out when the day is agreed. It names your business, the address, the date and arrival window, who will be on site, what the customer needs to do, and how to move the time. Access, dogs and whether the power will be off belong there.

The install reminder is shorter. The day before, repeat the time, the address and the link to move it, and ask them to confirm the roof access is still clear. On the day, one or two lines are enough. Keep the same two times each week so you can tell whether they help.

The link has to show times the crew can actually make. How the booking calendar and the staff calendars stay in step is on calendar sync. If nobody is home, one message the same day is enough, with a way to pick another time. Then stop.

What goes on the handover, including the certificates?

The handover checklist is what you walk through with the customer and what you keep for the claim: the system as installed, the photos from the three stages, the signed statements, and the electrical certificate for that state. Ausgrid asks for a Certificate of Compliance for Electrical Work. Use the certificate the job’s state requires.

STC paperwork sits on the same list, with an owner and a due date. Certificates are created within 12 months of the installation. Many households assign that right to a registered agent. If they do not, the 12 months still runs, and a new account can take 6 weeks or longer. Documents are signed before anyone creates the certificates. Take the photos on the day.

A review request is a separate message, sent when the job is actually complete. Make a delay visible early enough that handover is not the moment the customer hears about it.

Where does the install date sit?

The install date belongs on the same record as the enquiry, the site notes, the stock and the paperwork, with a person named against the next step. A separate spreadsheet that nobody opens on Friday will not keep the day honest.

LYD Solar Suite solar CRM runs the stages from enquiry to site visit, quote, accepted proposal, install booked and job complete. Site-visit confirmations and reminders go by SMS and email. The install stage holds the date, crew notes, photos and checklists, and the certificate paperwork sits on the job. The page says the suite organises the records and does not issue, approve or guarantee accreditation.

Plans for Launch Your Dream are on the pricing page.

If the handoff from quote to roof needs a workflow built around the office you already run, that is AI agent deployment from Sharktech Global. The same work on this site is AI agent deployment. If the computers and email also need looking after, that is managed IT support from Sharktech Global, and managed IT on this site. Sharktech Global serves NSW and regional NSW, Monday to Friday, 9am to 7pm, with after 7pm and Saturdays by appointment.

Book a free 30-minute meeting with our senior engineer in the online calendar.

General information for solar and electrical business owners, not accreditation, network or certificate advice. Check the Clean Energy Regulator, Solar Accreditation Australia and the electricity network for the property before you lock a roof day or create certificates.

Common questions

Does the electrician on the roof have to be accredited if the job will claim certificates?
For a system that is to be eligible for small-scale technology certificates, the Clean Energy Regulator requires a designer and an installer accredited by Solar Accreditation Australia for that type of system. Accreditation moved across from the Clean Energy Council. An electrical licence on its own is not that accreditation. The accredited installer also needs the electrical licence the state or territory requires, with narrow exceptions the regulator sets out.
Can two accredited people share one roof?
Yes, when the job needs more than one person or a handover during the day. For a small-scale system up to 100 kW, the Clean Energy Regulator asks to be told before the installation, with each person's details and the reason. Each person still has to be accredited for the type and licensed for the electrical work.
Can the roof day be promised before the network has approved the connection?
In Ausgrid's process, the installer completes the installation once the application is approved. Many small systems are approved automatically, but the application is still made. Other distributors publish their own order. A date promised before you know that step is a date you will be moving.
How long is there to create the certificates?
The Clean Energy Regulator says certificates are created in the REC Registry within 12 months of the installation date, and the documents have to be signed before you create them. Validation usually takes 4 to 6 weeks, and longer if something is missing or incorrect.
Does the solar CRM lodge the certificate claim?
No. LYD Solar Suite can keep the paperwork trail on the job so you can see what is collected and what is missing. Creation stays with the system owner or their registered agent in the REC Registry. The suite does not issue or approve accreditation.
Who built Launch Your Dream?
Launch Your Dream is built and supported by Sharktech Global (opens in a new tab), an Australian managed IT and AI agent deployment company serving NSW and regional NSW.